Roll out a change under load
A rollout spends spare capacity while a replacement warms. Draining protects existing streams only while their termination deadline allows.
Before you start
Your deployment, load trace and client-side measurements. Set a rollback threshold before changing the image.
Read and predict 1 hour including video
Inference Engineering · §7.3.3 pp. 196–197; §7.4–7.4.3 pp. 199–204
Use the printed page numbers. In the supplied PDF, add two to reach the viewer page. Write a prediction for the question below before opening its answer.
Designing Data-Intensive Applications · Kubernetes · pod probes
Build and test 3 hours
Roll a worker version while driving traffic. Repeat with a dead worker and with uncached weights. Record detection, removal, readiness and recovery times.
Capture a healthy minute
Run a fixed arrival rate for 60 seconds. Record ready worker count, attempts, successful completions and first-token latency.
Change one worker
Roll to a new version while traffic continues. Timestamp readiness loss and recovery. Repeat with one abrupt worker exit.
Write the incident timeline
Order the client symptom, first signal, routing change and first healthy completion. Calculate recovery time using named endpoints.
Troubleshooting
If traffic reaches a cold worker, check when its readiness probe begins succeeding.
Save your result 1 hour
Save an incident timeline and a rollback decision with observed failure rate, TTFT and ready capacity.
Explain from memory 1 hour
Two replicas are saturated. What resource does a blue-green rollout need that a tight GPU quota may deny?
Check your reasoning
Enough spare capacity to warm the replacement pool while the original pool serves traffic. Consider a smaller canary and staged replacement.
Write a five-line incident report with symptom, timeline, evidence, mitigation and one follow-up test.